Rebuilt Assembly and Exchange Program
Production downtime and associated labor costs can be significantly reduced when completely rebuilt assemblies are utilized instead of in-plant overhauls of filler equipment. Installing a rebuilt carriage, for example, takes only 2 to 5 days compared to the typical 7 to 14 days when rebuilding a carriage in your plant using individual parts.
The Bevcorp Exchange Program Includes:
- Fillers
- Combining Table Assemblies (Including Gear Train)
- Carriages
- Filling Unit Pedestal & Center Column Assemblies
- Gear Boxes
- Crowners
- Rinsers
How We Rebuild It
The used equipment is completely disassembled to the base casting. The casting is then sandblasted and inspected, and all worn areas are brought back to new machine size, painted with industry-tested paint and completely rebuilt with new and rebuilt components.
You install the rebuilt assembly (or have our professional service staff install it) and return your used assembly to us. Many upgrade options are offered.
How You Save
- Rebuilt components are more economical than new
- Reduce production down time by installing assemblies rather than individual parts
- Receive credit for your used exchange assembly
